Tests find North West overhead power lines in tip top condition

Easter rail works – spotlight on West Coast Main Line
March 24, 2021
RPC Working & Overseeing Major works over the Easter Blockade in Greater Anglia.
April 2, 2021
Easter rail works – spotlight on West Coast Main Line
March 24, 2021
RPC Working & Overseeing Major works over the Easter Blockade in Greater Anglia.
April 2, 2021

Tests find North West overhead power lines in tip top condition

Pioneering tests of almost 800 miles of high-voltage overhead electric cables which power trains have shown they are in great condition on key North West rail routes.

In a North West first, an electric train specially equipped with a system called PANDAS* checked the overhead lines to find underlying faults before they can escalate.

Dramatic footage released by Network Rail today (Friday 26 March) shows what happens when such faults cause the complex network of power lines to come down – causing long and costly delays to passengers and freight.

Click here for full article:https://www.networkrail.co.uk/news/tests-find-north-west-overhead-power-lines-in-tip-top-condition/

Comments are closed.